Collectors / sewers

Image

Public works

Stadsbader performs a lot of combined construction sites where, in addition to construction of new roadways, there are sewage works involved.

At the behest of sewer operators (e.g. Fluvius, Farys, etc.) and cities, mixed sewers are being opened up and replaced with separate sewer systems that dispose of wastewater and stormwater separately. These sewer systems are usually constructed in concrete, vitrified clay, PVC, pp, etc.

The wastewater goes through the collector sewer (also called collector) to a treatment plant. Stadsbader has also built numerous on-site wastewater treatment plants, but likewise, after internal study and consultation with the client, it was decided to have a prefabricated structure made to be installed on site. This can be a big time saver for the client.

Stadsbader also has the necessary knowledge and availability regarding cranes, sewerage teams, shoring techniques, etc. These are necessary to carry out the sewerage works qualitatively within the predetermined construction period.

Private works

In several works for private clients, we also develop the sewerage part within the predetermined deadline and within the bounds of the client's building permit.

The rules governing discharge of rainwater into the sewer system are also becoming more and more stringent, leading to the adoption of techniques whereby buffering is created by infiltration crates.

Everything is worked out by our internal study service that responds to the needs of the client.